This seven floor commercial office block housing many blue chip media companies suffered a total structural failure to its 900Kw boilers.
Having been called in by the landlord a temporary containerized boiler was located in the car park complete with ....MORE
This nine storey multi-tenancy office block, situated over Green Park Tube Station had heating and chilled water distribution systems that were rapidly reaching the end of their economical use.
New infrastructure distribution pipework was designed by consultants and the scheme was developed by R.A. Ford to include new pipework, transfer pumps and BMS controls ....MORE
This five storey commercial office within the heart of Moorgate houses several blue chip tenants within the financial services sector.
The existing air cooled chillers located on the roof had reached the end of their economic life....MORE